EX-01
WorkingExcavator · Caterpillar 390F (2019) · 8,866 h · Scroggie Creek
Last seen 11:32:40
Digital twin
Live machine view
Work cycle, load, fuel and lamps follow live telemetry. Drag to rotate, scroll to zoom.
Working
Assignment
Feeding WP-1
Operator Helder Ribeiro
Wash plant
s-scr-wp1
Hours today
3.7 h
Cycle time
31s
Cycles today
312
Engine hours
8,866 h
Next service
in 310 h
Telemetry
Live readings
Engine speed
1,712rpm
Coolant
90.1°C
Hydraulic oil
73°C
Hydraulic pressure
321bar
Bucket fill
87%
Fuel burn
58.3L/h
Fuel
Tank level
48%
477 L
In tank
58.3 L/h
Burn
8.1 h
Range
Utilisation
Hours on this shift
3.7 h
of a 12 h shift · 31% utilisation
Load
87%
Engine speed
1,712 rpm
Coolant
90 °C
Per hour
Utilisation and fuel burned today
Production day starts at 07:00.
Utilisation · %
Fuel · L
Alarms
Alarms (0)
No alarms on this unit in the last 48 hours.
Engine history
Engine speed, coolant and fuel level
Engine speed · rpm
Coolant · °C
Fuel level · %