EX-01
WorkingExcavator · Caterpillar 390F (2019) · 8,866 h · Scroggie Creek
Last seen 11:19:13
Digital twin
Live machine view
Work cycle, load, fuel and lamps follow live telemetry. Drag to rotate, scroll to zoom.
Working
Assignment
Feeding WP-1
Operator Helder Ribeiro
Wash plant
s-scr-wp1
Hours today
3.5 h
Cycle time
31s
Cycles today
295
Engine hours
8,866 h
Next service
in 310 h
Telemetry
Live readings
Engine speed
1,716rpm
Coolant
90.3°C
Hydraulic oil
73.3°C
Hydraulic pressure
322bar
Bucket fill
88%
Fuel burn
58.5L/h
Fuel
Tank level
49%
487 L
In tank
58.5 L/h
Burn
8.3 h
Range
Utilisation
Hours on this shift
3.5 h
of a 12 h shift · 29% utilisation
Load
88%
Engine speed
1,716 rpm
Coolant
90 °C
Per hour
Utilisation and fuel burned today
Production day starts at 07:00.
Utilisation · %
Fuel · L
Alarms
Alarms (0)
No alarms on this unit in the last 48 hours.
Engine history
Engine speed, coolant and fuel level
Engine speed · rpm
Coolant · °C
Fuel level · %