Serra de l'Ebre
Needs attentionCatalonia · Wind · 57 MW installed · 5 technicians · manager Firas Cheaib
15.2 MW
27 %
178 MWh
96.6 %
9 / 13
6
Wind
9.9 m/s W
Irradiance
372 W/m²
Temperature
21.5 °C
Cloud cover
29 %
Conditions
Sunny intervals
Substation
Ascó SE 400 kV
Voltage
399.3 kV
Frequency
50.019 Hz
Power factor
0.973
Curtailment
8 %
Day-ahead price
70.67 €/MWh
Assets
13 assets on site. Open one for its live 3D view.
Wind turbine
WTG-03
Siemens Gamesa SG 5.0-145 · 6.2 MW
Output
2.37 MW
Today
33.0 MWh
Wind
9.2 m/s
Wind turbine
WTG-04
Siemens Gamesa SG 5.0-145 · 5.0 MW
Output
1.11 MW
Today
19.1 MWh
Wind
8.1 m/s
Wind turbine
WTG-05
Siemens Gamesa SG 6.6-170 · 6.2 MW
Output
0.00 MW
Today
8.4 MWh
Wind
6.9 m/s
Wind turbine
WTG-07
Siemens Gamesa SG 5.0-145 · 5.0 MW
Output
0.00 MW
Today
22.6 MWh
Wind
8.3 m/s
Wind turbine
WTG-08
Nordex N149/4.0-4.5 · 5.0 MW
Output
2.83 MW
Today
16.9 MWh
Wind
10.3 m/s
Wind turbine
WTG-09
Siemens Gamesa SG 6.6-170 · 6.2 MW
Output
1.68 MW
Today
12.3 MWh
Wind
10.5 m/s
Wind turbine
WTG-10
Siemens Gamesa SG 6.6-170 · 4.2 MW
Output
2.08 MW
Today
13.7 MWh
Wind
10.1 m/s
Inverter skid
INV-01
Sungrow SG3125HV-MV · 4.6 MVA
Output
0.45 MW
Today
21.7 MWh
Availability
99.5 %
Inverter skid
INV-02
SMA Sunny Central 4600 UP · 3.1 MVA
Output
0.46 MW
Today
13.2 MWh
Availability
96.3 %
Blade ice detected
Generator winding temperature high
Yaw misalignment above limit
Pitch system hydraulic pressure low
Cooling fan failure
Service interval exceeded